We recently completed a commercial solar and battery installation for the new official BYD dealership and service centre on the Gold Coast.
The 39.9kW project combines solar generation with 60kWh of battery storage to create a smarter and more flexible energy system for the site, primarily to support the site’s service and EV charging capabilities.
System overview
- 39.9kW solar system
- 76 × Trina Solar 510W panels
- 2 × Sungrow SBH 30kWh batteries (60kWh in total)
- 1 × Sungrow 25kW hybrid inverter
Built for EV charging
As more businesses move to electric vehicles, energy infrastructure is becoming more important. Solar and battery storage let a site generate and store its own energy during the day, then use it later when charging demand increases.
For BYD Burleigh, this system helps:
- Reduce electricity costs
- Lower reliance on the grid
- Support cleaner EV charging
- Improve energy flexibility during peak demand periods
- Prepare the site for future electrification growth
The future of commercial energy
Commercial solar is continuing to evolve alongside battery storage and EV infrastructure. Businesses are increasingly investing in integrated energy systems designed for performance, resilience and long-term operational savings.